Showing posts with label Knitting. Show all posts
Showing posts with label Knitting. Show all posts

Thursday, February 11, 2010

Because there are other things I don't want to do more

I'm posting as a form of procrastination. I have tons of things to do, most of which are urgent, none of which are fun, and all of which are making me want to hide in bed with the comforter over my head. If I can't see it, I don't have to deal with it, right?

As part of my ongoing efforts to put off unpleasant tasks, I've been doing a considerable amount of knitting. I've got a little progress to report on my finish or frog list, and I've actually started (or am about to start) two new projects (I know, I know, but I needed a sock project to work on and I had a new Rockin' Sock Club kit to open, and then the Yarn Harlot started the Winter Knitting Olympics, and I had a skein of Wollmeise that was just begging to get knitted up into this.) I mean look at this -- how could I resist?
Forgetmenot
This picture does not do it justice. I can't wait to cast on tomorrow night!

Finish or Frog Progress (from this post)

And there are pictures!
1. The Reluctant Scarf -- done!
reluctant

10. Purple Tomato -- an inch to go until I hit the bottom ribbing. I'm almost there.
Tomato2

13. Twisted Flower Socks -- done!
Twisted

14. Market Bag -- done!
Market

15. Plaid Messenger Bag -- done!
Felted
Please note the official yarn inspector, first class, there in the lower right.

All this yarn, and she doesn't get to chew on any of it. You'd be disgruntled, too.
Hmpfh

This was a nice break from the proofreading I ought to have been doing, but all those French vowels aren't going to get their accents put in by themselves. I'm off to go insert some accents aigus. And then my duvet and I have a little appointment to keep.

Sunday, January 17, 2010

Finish or Frog

More for my own reference, and to take stock and see just how bad it is

1. The Reluctant Scarf -- not sure why this one stalled out, except that I always forget how long scarves can take. But I only have about 25g of yarn to go, so this one should go quickly. (Finished 1/2010)

2. The Big Blue Afghan -- I'm going to finish the repeat I'm on and then start the border. This one has been going on for nearly a decade and it's time to be done with it.

3. Plum socks -- these are my traveling project. They'll get done sooner or later.

4. Lotus Blossom Tank -- I stalled out on the bust darts, but it's a bottom up tank and I'm up to the bust, so I'm nearly there, right?

5. Hey Teach! cardigan -- all knit up, just needs to be seamed up.

6. Mystery Stole 3
7. Mystery Stole 4
8. Icarus Shawl -- I'm more than halfway done on all of these. I just need to keep pushing through. I like lace knitting, I'm not sure why I have so much trouble finishing it.

9. Clapotis -- again, I always forget how long scarves take. I'm maybe 1/3 of the way through this one?

10. Purple Tomato -- stalled out at the colorwork band. Right now it's a crop top. I need to get it down to a wearable shirt-length. (One inch left to go till the ribbing 2/11/10)

11. Girasole -- lace knitting + big blanket = I eventually gave up. But it's so pretty!

12. Baby Surprise Jacket
13. Twisted Flower Socks (Done 2/5/2010)
14. Market Bag (Done 2/5/2010)
15. Plaid Messenger Bag -- all these projects need are buttons sewn on and/or ends woven in. I really have no excuse except for my own laziness. (Done 2/5/2010)

16. Vintage Baby Blanket
17. Granny Square Afghan -- projects I've inherited from relatives. I'm not worried about the granny squares, they'll happen sooner or later. But the baby blanket needs to get going, one way or another. I do have some baby gifts to make for this spring, so I might see how this one works, but if I don't like it, I'll be frogging this one for sure.

18. Baby booties -- why would I knit one bootie (booty? that doesn't seem right) and stop there? I don't know either.

18 projects. I think that's it. That's kind of a high number. I need to think about which ones I really want to tackle and which ones I need to let go. For now, I'm going to concentrate on my scarf. It's so close I can feel it. The ball of yarn has to run out sooner or later, right?

On the other hand:
Things I've finished since September 19
1. Crazy zauber-socks
2. Socks for Mom 2
3. Baby jacket and hat for Vishal
4. 3 squares for Schuyler's Blanket project